How it works

Read the site summary, then open what slipped

Open the site summary and the number that slipped is one click from the asset that moved it. Everything on these screens is read by a person; nothing here acts on its own.

  • OEE by line, this shift 84 Weld Line 1 79 Machining Cell A 88 Assembly Line 1 71 Paint Booth 2

Executive summary

See the whole site on one screen

The site summary metric is there the moment you open the dashboard. It rolls up from asset to line, to area, to site, so you can drop down to wherever the number moved. Compare any date range against another without leaving the screen.

  • Site summary metric on open
  • Roll-up from asset to line, area, and site
  • Any date range, compared against another
  • Assets, live: Dunmore Tool QT-250 Lathe WO-118351 79.4 Running

Assets, live

Filter every asset by running, faulted or idle

Every asset shows its live state: running, faulted or idle. Filter the whole site down to just the state you want to see. Availability, performance and quality sit on the same screen, so you’re not hunting across tabs.

  • Running, faulted, and idle on every asset
  • Filter the site by state
  • Availability, performance, and quality on the same screen
  • Two orders contending for Cell A
  • Materials: order needed

Command center

Open the command center for your function

Each command center opens on your function’s own exceptions. Production planning shows the plan, the schedule and what slipped. Materials planning shows what needs ordering and run readiness; quality shows open holds, defects and the sweep schedule.

  • Production planning: the plan, the schedule, and what slipped
  • Materials planning: what needs ordering and run readiness
  • Quality: open holds, defects, and the sweep schedule
  • Bottlenecks: Weld Line 1 16h 20m 14 pc waiting on WLD-007 Bottleneck
  • What-if: swap to Cell A

Bottlenecks

Find the bottleneck by line and by asset

The constraint is named down to the line and the asset, so nobody hunts for it. Planning issues list the reason each one was raised. Run a what-if simulation before you commit a plan and see the effect first.

  • The constraint named per line and per asset
  • Planning issues list the reason each was raised
  • What-if simulation before a plan is committed
  • Site OEE, 30 days84

Trend analytics

Read a month of trend from daily records

One daily record per asset is kept for trend, so a month of history is already there when you need it. Backfill a range after a correction and the trend updates with it. Every series comes with a chart and a tooltip to read the exact number.

  • One daily record per asset, kept for trends
  • Backfill a range after a correction
  • Charts and tooltips on every series
  • Command center readoutRead-only, no trigger
  • Roadmap

Read-only dashboards

Read the dashboards yourself. Nothing acts on its own.

These dashboards have no schedule, no event trigger and no autonomous action behind them. You read them yourself. The Planner and the Auditor are the Agents that act, inside the authority you set, and what they raise reaches you in the Notification Center.

  • No schedule, no event trigger, no autonomous action
  • The Planner and the Auditor are the Agents that act
  • Notifications reach you in the Notification Center, by role
  • Handover log Torque Station 3 Dunmore Tool QT-250 Lathe Ardenweld Arcline 120

Assets and OEE

Use the same screens at every shift handover

Every number on the handover screen traces back to a reading in the Historian, so the off-going and on-coming shift argue about the plant, not the spreadsheet.

  • Every number traces to a reading in the Historian
  • The same screens for both shifts at handover
  • No re-keyed handover sheet

What opens on a shift manager's screen

    • Assets, live: Weld Line 1 BRF2-LN-03 84 Running
    • 3 faulted

    See what's faulted without walking the floor.

    Every asset reads running, faulted, or idle, right beside the OEE figures for its line. Filter down to what's faulted or idle and go straight to it.

    See live asset state
    • Command centers Production planning Materials planning Quality
    • Two orders contending for Cell A

    One command center for every function.

    Production planning, materials, and quality each open on the exceptions that belong to that team today. The constraint on the schedule is named by line and by asset.

    See the bottleneck view

FAQ

Tell us what your command center needs.

It's on the roadmap. What the Manager should watch and raise on its own is still being defined, and your input shapes it.