A dedicated changeover screen shipped this release, the first place to track and manage the time it takes to switch a line between products. It’s a small screen with a specific job: set changeover times once, and let the rest of production planning read from it, rather than a planner keeping that knowledge in their head. Also in this release Admin configuration tabs are now restricted to the right permission level for the first time Order and job-order numbers were cleaned up across the interface for readability Executive reporting gained tooltips on late orders, linked directly to their order detail screens FixesFixed an under-allocation issue in the automated scheduler