• Schedule_v14_FINAL.xlsx, edited 2 min ago
  • Production plan Line 1 Sequenced Line 2 Sequenced Line 3 Sequenced
  • Plan v41.2: 214 of 214 sequenced v41.2 Committed, L. Haddad 06:10

The plant runs on Schedule_v14_FINAL.xlsx.

One schedule everyone reads, and every change is logged.

Old way

the spreadsheet is the schedule, emailed around, one bad edit from being wrong for everyone.

New way

the plan builds from open orders and goes to the floor terminal, one job at a time.

  • Every change is logged: who, what, when.

The plan comes from open orders, not from a spreadsheet.

Here's the chain that builds it, one step at a time.

  1. Facility Organizer

    Describes the site once: lines, cells, shifts.

  2. Asset Registry

    Holds every machine and what it can run.

  3. Scheduling Engine

    Builds the plan from open orders, not a spreadsheet.

  4. Screen Configurator

    Puts the plan on the floor terminal, one job at a time.

  5. Governance

    Logs who changed what, and when.

Start with: Facility Organizer and Asset Registry

One of our customers runs 19 facilities on a single installation of the platform.

Bring the spreadsheet. We'll show you what replaces it.

30 minutes with the floor screen next to the plan it came from. Bring whatever your schedule file is called.