Planners can now sequence production orders on a board, dragging them between areas, lines, and assets. The rules for each product line are checked on the drop. The board puts the planner’s sequencing on the screen. Move an order to a line that cannot run it, and the board tells you before the order lands there. Run Schedule board Drag orders by area, by line, or by asset Product-line rules are enforced as you drop Suppliers as a managed record Suppliers used to be a name typed on each purchase order, so the same supplier could be entered more than one way and its history was hard to pull together. They are now a single managed record that every purchase order points to. Existing purchase orders were moved over automatically. Inventory on physical bins Holds, transfers, and moves now work on the physical bin a quantity sits in. This continues the inventory work from the last release, and it is what makes location-level counts line up with the shelf. ImprovementsReceiving accepts an over-receipt with a warning instead of blocking itExisting purchase orders linked to the new supplier records